SpaceFrame Kalbarri Reliability Project

SpaceFrame Kalbarri Reliability Project

The CPR Electrical team has successfully completed the Design and Construct of a new Light and Small Power Switch room including Air conditioners for SpaceFrame Buildings.The Switch room was built for a new solar farm out from Kalbarri for Western Power. CPR was able to supply a total of 16 Air-conditioners, 36 general power light fittings among other associated equipment.

CPR was able to successfully complete the project in a few weeks with the help of many traders.

Project Highlights:
• CPR was able to complete the Project in a few weeks.
• CPR was able to supply a lot of needed equipment.

Metroll Post Machine

Metroll Post Machine

The CPR Electrical team has completed installation and commission of the New Metroll Post Machine with the help of Metroll Management. This machine is able to form fence rolls, uncoil and robotically stack. This kind of machinery is its kind at Metroll Roll Forming.

In order for the Roll Former to be installed, Metroll has to decommission,relocate and recommission other roll formers in order to prevent interruptions of production. Now that Metroll has the new machinery , they’re able to terminate the MCC,robotic controller,new safety gate switch and operator console. Metroll was able to terminate this machinery in out of office hours to ensure the smooth transition of commission in the following week. The extensive Point to Point testing and ITP help with the commissioning.

Project Highlights:
• CPR was able to relocate 3 machines in 1.5 days and install a new machine in 1.5days which was ready for commission immediately.
• Extensive Point to Point testing and ITP for smooth commissioning

 

 

Metroll ASC Super Mill

Metroll ASC Super Mill

The CPR Electrical team have recently completed the installation and commission of the Metroll ASC Super Mill roll former with the close assistance of Metroll Management and the American Manufactures ASC to ensure the project is delivered in the given time span. This is the second build we have built for Metroll, the first was a post machine install in 2019.

The Super Mill Roll Former is the first of its kind in Australia and will Increase the Production of Purlins. The Super Mill spans an impressive 60m and it utilises a deep 4m ‘Loop Pit’ .This unique design automatically stacks and flips the Purlins for strapping. Therefore making the work of Metroll more efficient. The Super Mill requires a 460 amp power supply and is shipped from the US in 6x sea containers with an approximate cost of $2.5M.

Project Highlights:
• The Project was completed in 3 weeks without any errors.
• The Project was completed with the assistance of Metroll Mechanical fitters and ASC Programmers
• The Super Mill Roll Former is the first of its kind in Australia

   

EDI Remote Pump Stations

EDI Remote Pump Stations

The CPR Electrical team have successfully completed the Design and Construct build for EDI Remote Pump Stations. This was a project for a diesel powered pumping station which is able to connect to various tanks for the purpose of loading trucks. The Pump stations will be fitted with sonar level detection and digital display for the accessible use of the pumps.

The project was completed in 20 weeks and under budget.

Project Highlights:
• We worked with the client to deliver a package that suited their needs.
• The Project was a design and construct build.
• The Project was delivered under budget and on time.

Forster Park Lights Upgrade for Belmont Shire

Forster Park Lights Upgrade for Belmont Shire

Stadium Lights Installation

CPR Electrical designed and constructed the upgrade of the Forster park football oval lights. CPR were approached by Belmont football club to design and construct lighting upgrades for their oval after being awarded an $80,000 grant in the year of 2017. CPR electrical worked with Eye lighting to produce a concept that suited the clubs needs and budget. 2 x 30m lighting towers were installed each with 3 x 2000w 415v.

Project Highlights:

The window that was given to deliver this project held no room for error; it stood between Baseball finals and the start of the AFL football season. Any damage to the oval could have impacted both sports. CPR managed to complete the project with no damage to the oval which surprised the Council and the football club. The project was completed with no incidents, accidents or near misses.