Remote Diesel Pump Station Design & Build

for

EDI

Custom-designed and built remote diesel-powered pump stations with sonar level detection and digital displays, completed in under 20 weeks with 1–3 day electrical installations per station.

Remote diesel pump station design and build with digital monitoring by CPR Electrical for EDI in regional WA

Overview

CPR Electrical designed and built remote pump stations for EDI, creating diesel-powered pumping systems capable of connecting to various tanks for truck loading operations. Each station features advanced sonar level detection and digital displays for precise monitoring and control.

The pump stations were specifically engineered to meet EDI's operational requirements for efficient and reliable truck loading in remote locations, demonstrating CPR's capability in designing and constructing purpose-built electrical infrastructure for regional applications.

Scope of Work

• Custom design and construction of remote pump stations

• Diesel-powered pumping system installation

• Sonar level detection system integration

• Digital display and monitoring systems

• Multi-tank connection configuration

Diesel-powered remote pump station with sonar level detection designed by CPR Electrical for EDI
Digital monitoring system installation at remote pump station in regional Western Australia
Completed remote diesel pump station with integrated monitoring by CPR Electrical for EDI WA

Challenges & Solutions

Challenge

Designing self-contained, diesel-powered pump stations for remote deployment required engineering solutions that would operate reliably with minimal ongoing supervision while accommodating varying tank configurations at each site. The remote locations across regional Western Australia meant each station had to be robust enough to withstand harsh environmental conditions and simple enough for local operators to monitor via the integrated digital display and sonar systems.

Solution

CPR engineered a standardised yet adaptable pump station design incorporating sonar level detection for automated monitoring, digital displays for operator visibility, and flexible tank connection interfaces. Each installation was tailored to site-specific tank configurations while maintaining a common electrical architecture for consistent maintenance and spare parts management. The modular design approach allowed rapid deployment with individual electrical installations completed in just 1–3 days depending on tank complexity.

Project Outcome

Entire pump station project delivered in under 20 weeks with individual electrical installations completed in 1–3 days depending on tank complexity. The stations now operate reliably across EDI's network of remote loading facilities.

Key Project Details

Client: EDI

Location: Regional Western Australia

Industry: Energy & Utilities

Project Type: Remote Electrical Design & Build

Duration: Under 20 weeks total

Get a Quote or Book a Service

Contact us today to discuss your electrical project, maintenance program, or complex project works, servicing Perth, Bunbury, and all of Western Australia.

Fully Licensed & Insured

24/7 Emergency Support

Industrial & Remote Site Ready

LVR/CPR Trained & Certified

20+ Years Experience

AS45001:2018 Accredited

Perth

Bunbury

South West

Pilbara

Goldfields

Regional WA

bottom of page