The CPR Electrical team has completed installation and commission of the New Metroll Post Machine with the help of Metroll Management. This machine is able to form fence rolls, uncoil and robotically stack. This kind of machinery is its kind at Metroll Roll Forming.

In order for the Roll Former to be installed, Metroll has to decommission,relocate and recommission other roll formers in order to prevent interruptions of production. Now that Metroll has the new machinery , they’re able to terminate the MCC,robotic controller,new safety gate switch and operator console. Metroll was able to terminate this machinery in out of office hours to ensure the smooth transition of commission in the following week. The extensive Point to Point testing and ITP help with the commissioning.

 

Highlights:
  • CPR was able to relocate 3 machines in 1.5 days and install a new machine in 1.5days which was ready for commission immediately.
  • Extensive Point to Point testing and ITP for smooth commissioning