Solar Farm Switch Room
for
SpaceFrame (for Powins / Western Power)
Design and construction of a Light and Small Power Switch Room for a Kalbarri solar farm, including 16 air conditioning units and 36 power light fittings for Western Power's renewable energy infrastructure.

Overview
CPR Electrical designed and built a new Light and Small Power Switch Room for SpaceFrame, working on behalf of Powins to ultimately serve Western Power's Kalbarri Reliability Project. The switch room supports the region's new solar farm operations, ensuring reliable power distribution and environmental control for critical electrical infrastructure.
The project involved supplying and installing 16 air conditioning units to maintain optimal conditions for sensitive electrical equipment, plus 36 general power light fittings — demonstrating CPR's capability in delivering turnkey electrical solutions for renewable energy infrastructure in regional Western Australia.
Scope of Work
• Design and construction of light and switch room
• Supply and installation of 16 air conditioning units
• Installation of 36 general power light fittings
• Power distribution and control systems
• Regional logistics coordination



Challenges & Solutions
Challenge
Delivering a purpose-built switch room in a remote regional location required extensive logistics coordination for transporting specialised equipment and materials to Kalbarri, approximately 550 kilometres north of Perth. The switch room's environmental controls had to be capable of handling the region's extreme temperatures, which regularly exceed 40°C in summer, to protect sensitive electrical switchgear and distribution equipment from thermal damage.
Solution
CPR managed the full design-and-construct scope from Perth, coordinating material procurement, transport logistics and deployment of an experienced installation team to Kalbarri. The 16 air conditioning units were specified and installed to maintain equipment-safe operating temperatures in the harsh regional climate, with redundancy built in to ensure continuous cooling under worst-case conditions. The switch room was delivered on schedule, commissioned and handed over ready for integration with the solar farm infrastructure.
Project Outcome
Switch room delivered within a few weeks, providing reliable power distribution and climate control for Kalbarri solar farm's critical electrical infrastructure. The project demonstrates CPR's capability in supporting Western Australia's growing renewable energy sector.
Key Project Details
• Client: SpaceFrame (for Powins / Western Power)
• Location: Kalbarri, Regional WA
• Industry: Energy & Utilities (Renewable)
• Project Type: Remote Electrical Design & Build
• Duration: Completed within weeks
Get a Quote or Book a Service
Contact us today to discuss your electrical project, maintenance program, or complex project works, servicing Perth, Bunbury, and all of Western Australia.
Fully Licensed & Insured
24/7 Emergency Support
Industrial & Remote Site Ready
LVR/CPR Trained & Certified
20+ Years Experience
AS45001:2018 Accredited
Perth
Bunbury
South West
Pilbara
Goldfields
Regional WA